The floor problems offices & lobbies owners face
Dull, worn concrete or old tile makes lobbies and offices look dated.
Standard coatings off-gas VOCs that bother tenants during cure.
Long closures for flooring work disrupt tenants and business.
Foot traffic and rolling chairs scuff and dull ordinary floors.
Spills from coffee and food stain porous concrete.
Poor lighting from dark floors makes offices feel dim.
The system we recommend and why
Low-VOC epoxy with quartz or flake finish
Offices and lobbies need a clean, modern floor that does not off-gas during cure and can be installed with minimal disruption to tenants. A low-VOC epoxy with a quartz or flake finish gives the look, and nights-and-weekends scheduling keeps the building running.
How it goes down
- 1
Diamond grind the slab and repair any cracks or spalls.
- 2
Apply a low-VOC epoxy primer keyed to the slab.
- 3
Apply a colored low-VOC epoxy body coat.
- 4
Broadcast quartz or flake for a clean, modern, light-reflective look.
- 5
Topcoat with a low-VOC, UV-stable clear for gloss and wear resistance.
Cure time
Body coat cures overnight; topcoat is walk-ready in 12-24 hours.
Return to service
Light traffic in 24 hours, full office use in 48 hours.
What to ask any offices & lobbies floor installer
Use this checklist on every quote. The right installer answers these clearly; the wrong ones dodge them.
Is your system low-VOC for an occupied building?
Can you do a quartz or flake finish, and what color options are there?
Is the topcoat UV-stable so it will not yellow near windows?
Can you work nights and weekends so tenants are not disrupted?
How do you handle furniture and equipment moves?
What is the maintenance schedule to keep the floor looking new?
When epoxy is the wrong choice
A high-VOC epoxy installed during business hours is the wrong choice in an occupied office. It off-gases during cure, bothers tenants, and disrupts the workday.
The better alternative: A low-VOC epoxy with a quartz or flake finish, installed nights and weekends, is the correct system. For high-traffic lobbies, a more abrasion-resistant topcoat is the better fit.
How we keep your operation running
Offices cannot disrupt tenants for long, so we work nights and weekends and in sections. Low-VOC systems keep the air safe during cure, and fast-cure topcoats return a section to service in 24 to 48 hours. We coordinate furniture and equipment moves with your facilities team so the building keeps running.
What it costs in Columbus
Office and lobby floors in Columbus typically run $5 to $9 per square foot installed. Quartz and flake finishes and UV-stable topcoats add cost. These are estimates — your real price depends on the finish, the system, and the prep your slab needs.
What moves the price
Square footage and the finish — quartz, flake, or solid color.
Slab condition — cracks, old coatings, and tile to remove.
System type — low-VOC and UV-stable systems cost more.
Schedule — nights, weekends, or tight timelines.
These are estimates only. A real price comes after a free on-site walk-through.
Offices & Lobbies epoxy flooring — your questions
Related industries
Retail Stores
Clean, light-reflective floors that turn over fast
Learn more →Healthcare & Medical
Seamless, sanitizable floors for medical facilities
Learn more →Churches & Schools
Durable floors scheduled around breaks and summers
Learn more →Related floor systems
Decorative Flake Epoxy
Custom-color flake epoxy for retail, offices, and showrooms. Hides imperfections and gives a clean, finished look.
Learn more →Quartz Epoxy Flooring
Decorative quartz epoxy with built-in slip resistance. Tough, clean, and safe for wet and high-traffic areas.
Learn more →Polyaspartic Floor Coatings
Fast-cure polyaspartic coatings that return floors to service in hours, not days. UV-stable and great for showrooms.
Learn more →